Product Overview
With the support of our expert, our company is dedicated Exporter of Fresh Mango Peeling Machine in Shanghai, Shanghai, China. 1.Based on the following requirements: 1.Raw material :Mango juice; 2.Capacity:500KG-10T/H; 3.Final package: bottles(400-800g) or other package 2.Summary of the whole line 1.Processing fruits- mango 2.Processing capacitya process fruits(Raw material) 500KG-10T/H 3.Packaging of concentrating juice: aseptic bag with the capacity 1La 220L 4.packaging of the juice-- aseptic bag with the capacity 1L- 220L 5.Final productions-- juice and puree 6.Measure mode: Automatic measure, and filling 7.Processing mode: Automatic process and manually operate 8.Total consumption of compressed air: 3 M3 /min (supplied by customers) 9.Total consumption of steam: 2T/H (pressure: 10 Bar, supplied by customers) 10.Total consumption of water: 5T/H (20a , supplied by customers) 11.Total consumption of power: 220Kw/h (supplied by customers) 12.Circulation water: about 150T/H (20a , 200 cube pool built by customers) 13.Water supply: 5T/H (20a ) 14.Instruments in the lab: supplied by customers 15.Pipe,valve and ADK equipment motor: supplied by ADK 16.Workers: one shift in one day at least, need 6-8 workers per shift, and 2 managing persons per shift
With the support of our expert, our company is dedicated Exporter of Fresh Mango Peeling Machine in Shanghai, Shanghai, China. 1.Based on the following requirements: 1.Raw material :Mango juice; 2.Capacity:500KG-10T/H; 3.Final package: bottles(400-800g) or other package 2.Summary of the whole line 1.Processing fruits- mango 2.Processing capacitya process fruits(Raw material) 500KG-10T/H 3.Packaging of concentrating juice: aseptic bag with the capacity 1La 220L 4.packaging of the juice-- aseptic bag with the capacity 1L- 220L 5.Final productions-- juice and puree 6.Measure mode: Automatic measure, and filling 7.Processing mode: Automatic process and manually operate 8.Total consumption of compressed air: 3 M3 /min (supplied by customers) 9.Total consumption of steam: 2T/H (pressure: 10 Bar, supplied by customers) 10.Total consumption of water: 5T/H (20a , supplied by customers) 11.Total consumption of power: 220Kw/h (supplied by customers) 12.Circulation water: about 150T/H (20a , 200 cube pool built by customers) 13.Water supply: 5T/H (20a ) 14.Instruments in the lab: supplied by customers 15.Pipe,valve and ADK equipment motor: supplied by ADK 16.Workers: one shift in one day at least, need 6-8 workers per shift, and 2 managing persons per shift